(1) Brief (2) Teacher notes (3) Project construction details/pictures
Scroll down the page.
The lamp project was run over 15 weeks as a trial project in 2000 with a pass rate of 70%
The project can easily be modified to suit the ability of the student.
# The base could be cast and milled.
# A timing device could also be added to the circuit.
# The circuit can be used in different projects, using different outputs.
# The brief can be directed or left open according to student's capability.
# Every student will produce a different outcome even though they are using the same skill base.
Realted Studies(S4)-(NCEA1.7)
Students can look at the microchip.
# Development of the chip.
# Where microchips are used in today's society.
# The impact that the microchip has had on our lives (positive-negative).
Examples of previous student work is available to view to give direction for the related studies.